Project & SOLUTION POrtfolio:

Major North American Utility Company

SCADA Overlay | Energy Meter Data Integration | Met Tower Data Integration | ISO Data Integration


Led project to implement an Energy Management System (EMS), SCADA Overlay, and performance analytics tool on 25 sites, roughly 3.15 GW of wind, solar, and hydro capacity. 

The EMS installation included design and implementation of the following key solutions:

  • Integration to existing SCADA system
  • Integration of substation (Energy Meter) data
  • Integration of weather meter data
  • Integration of market price data

Large U.S. Energy Provider

SCADA Overlay | Production Forecasting | Performance and Condition Monitoring | GADS Reporting


Led project to implement an Energy Management System (EMS), SCADA Overlay, for operational management of 19 sites, amounting in ~4.5 GW of wind power (Roughly 2,138 turbines), and 298 MW of solar site capacity.

The EMS installation included design and implementation of the following key solutions:

  • Turbine Performance Optimization and Fault Analysis
  • Production Forecasting (Considering weather patterns)
  • Turbine Component Health Monitoring (blades, gearboxes, transformers, etc.)
  • Environmental Factors Support (noise/bird/bat/aircraft/other)
  • GADS Wind & Solar reporting

European Based Renewable Energy Firm

SCADA Overlay | SLD Design | Turbine Control | Bat Mitigation | Performance and Condition Monitoring | Financial Reporting | GADS Reporting | ETRM Integration


Led project to implement an Energy Management System (EMS), SCADA Overlay, for operations management on 16 sites, amounting in ~1.07 GW of wind power (349 turbines).

The EMS installation included design and implementation of the following key solutions:

  • Substation Single Line Diagram (SLD) and subsequent alarm configuration.
  • Command & Control to start/stop/reset turbines (For bat mitigation).
  • Underperformance and Condition monitoring/alarm configuration.
  • Financial report (Actual Production vs. Forecast), Gap Analysis for downtime, and GADS reports.
  • Interface with ETRM tools to pull in market data.

Additional Account/Experience

Multiple Energy Companies: Project management and PMO roles covering over 200 sites with a total generation capacity exceeding 20 GW.

  • Roles varied from direct project management to account oversight, involving detailed stakeholder engagement and advanced project planning. 

Client Testimonials

KP-i Solutions

Copyright © 2024 KP-i Solutions - All Rights Reserved.

Powered by GoDaddy

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept